|
WaterTreatment
Franklin Water Plant
The Franklin Water Plant is staffed 7 days a week, 365 days a year. The
average amount of
water treated by the Water Plant during the cooler months is 1.7
million gallons a day.
Whereas, in the warmer months, the amount of water treated goes up to
around 2.2 million
gallons a day.

|
Over 120
different contaminants are tested for by an independent laboratory to
meet EPA guidelines. Every day, the water is tested in the distribution
system at specific locations for chlorine residuals. Twice a month,
specific sites in the distribution system are tested for bacteria. The
amount of Bacteria samples that are pulled is based on population. The
Franklin Water Plant collects 16 samples a month. Also, Lead &
Copper sampling and testing at approved EPA sites is performed every
summer. If you ever have any questions, please feel free to contact us.
Quick Notes:
• Capable of treating 5 Million Gallons of Water a Day.
• Three Class IV Operators and one Class III Operator
on Staff.
• Recently nominated as Water Plant of the Year by the
KY/TN American Water Works Association.
|
|
|